Major Reports

Site-Wide

pdf Q1 2010 OM&M Full Report – Final

pdf Q4 OMM Full Report-final.pdf

pdf OMM Q3 Report.pdf

pdf Bay Shore/Brightwaters Former MGP Site Surface Water Sampling Results

pdf Bay Shore Q2 2009 OM+M Report Final

pdf Appendix A_Table A-1.pdf

pdf Appendix B.pdf

pdf Appendix C.pdf

pdf Appendix D Soil Vapor Analytical Results.pdf

pdf Appendix E.pdf

pdf Tables 2-1 through 6-7.pdf

pdf Bay Shore Q1 2009 OM+M Report Final

Bay Shore Q4 2008 OM+M Report Final

Bay Shore Q3 2008 OM+M Report Final - Appendices A-C
Bay Shore Q3 2008 OM+M Report Final

Bay Shore Q2 2008 OM+M Report Final

Bay Shore Q1 2008 OM+M Report Final


Final RI Report January 2003
ES and TOC Section 1.0 Section 2.0 Section 3.0
Section 4.0 Section 5.0 Section 6.0 Section 7.0
Appendices Cover Appendix A Appendix B Appendix C
Appendix D Appendix E Appendix F  
Remedial Operations Map for Former BayShore/Brightwaters MGP Site

OU-1

Phase I and II Remedial Activites Final Completion Report

Final Bay Shore Completion Report.pdf

Appendix A - Phase I As-Builts

Phase I Sheet 1 Phase I Sheet 2 Phase I Sheet 3


Appendix B - Phase I As-Builts

Phase II Sheet 1 Phase II Sheet 2 Phase II Sheet 3
Phase II Sheet 4 Phase II Sheet 5 Phase II Sheet 6


Appendix C - C3 Report

C3 Report C3 Appendix A C3 Appendix B C3 Appendix C
C3 Appendix D1 C3 Appendix D2 C3 Appendix E C3 Appendix F
C3 Appendix G C3 Appendix H C3 Appendix I C3 Appendix J
C3 Appendix K      

C3 Report Addendum

C3 Addendum Letter.pdf
Add Support 1- Davroc.pdf
Add Support 2- Affidavit.pdf
Add Support 3 Technical Data.pdf


Appendix D - Well Abandonment Report

Apd D - Well_Aban_Rpt.pdf


Appendix E - Waste Manifests and Disposal Docs

Bay Shore Phase I Manifest Tracking.xls
Bayshore Phase II Manifest Tracking.xls
Phase I COD_20090123153659.pdf
Phase II COD_20090123152352.pdf


Appendix F - Backfill & Compaction

Phase I Compaction Reports Compiled.PDF
Phase II Compaction Data Compiled 101408.pdf
Additional Compaction Reports Compiled.pdf
Back Fill Sample Log 100608.xls

Bay Shore Phase I Materials Back-up

April 2007 May 2007 June 2007 October 2007
November 2007 March 2008 May 2008

Bay Shore Phase II Materials Back-up

August 2007 September 2007 October 2007 November 2007
December 2007 January 2008 February 2008 March 2008
April 2008 May 2008 June 2008 July 2008
August 2008 September and October 2008  


Appendix G CAMP Report - GEI

Camp Appendix A - Not included
Camp Appendix B - Bay Shore.pdf

Camp Appendix C - Naphthalene Summary Data.pdf

CAMP Appendix D - Comprehensive Data Packages

0702594.pdf 0804476.pdf 0710475.pdf 0705046_fulldeliverable.pdf
0707015.pdf 0804565.pdf 0710188_fulldeliverable.pdf 0704313_fulldeliverable.pdf
0707343.pdf 0805029.pdf 0710302_fulldeliverable.pdf 0704404_fulldeliverable.pdf
0711487.pdf 0805371.pdf 0709637_fulldeliverable.pdf 0704143_fulldeliverable.pdf
0711613.pdf 0805378.pdf 0709497_fulldeliverable.pdf 0704011_fulldeliverable.pdf
0712115.pdf 0806100.pdf 0709284_fulldeliverable.pdf 0703617_032207fulldeliverable.pdf
0712304.pdf 0806229.pdf 0709128_fulldeliverable.pdf 0703408_fulldeliverable.pdf
0712439.pdf 0806377.pdf 0708628_fulldeliverable.pdf 0703272_fulldeliverable.pdf
0801026.pdf 0807087.pdf 0708468_fulldeliverable.pdf 0702594_022307fulldeliverable.pdf
0801138.pdf 0807189.pdf 0708361_fulldeliverable.pdf 0612375_Full-Deliverable.pdf
0801302.pdf 0807300.pdf 0708221_fulldeliverable.pdf  
0801406.pdf 0807494.pdf 0707553_fulldeliverable.pdf  
0801560.pdf 0807628.pdf 0707238_fulldeliverable.pdf  
0802175.pdf 0808157.pdf 0707015_fulldeliverable.pdf  
0802295.pdf 0808325.pdf 0707163_full deliverable.pdf  
0802426.pdf 0808480.pdf 0706440_062007_full-deliv.pdf  
0802602.pdf 0808670.pdf 0706310_fulldeliverable.pdf  
0803156.pdf 0809069.pdf 0706160_full deliverable.pdf  
0803303.pdf 0809259.pdf 0706057_053007fulldeliverable.pdf  
0803479.pdf 0809449.pdf 0705584_052807.pdf  
0803603.pdf 0711309.pdf 0705451_Fulldeliverable.pdf  
0804095.pdf 0711168.pdf 0705332_051007.pdf  
0804255.pdf 0710683.pdf 0705109_full deliverable.pdf  

CAMP Appendix E - Data Usability Summary Reports and Validated F

BayShore DUSRs and FORM1s.pdf

BayShore CAMP Text Tables Figs.pdf


Appendix K - Boundary Surveys

Survey 1of1.pdf
Survey 1of2.pdf


Appendix L - PDF Final Report - not included

 

 

 

pdf Phase IV Remedial Design Report for OU-1

Bay Shore OU1 - Final Supplemental IRM

Appendix A - Figures

FIGURE 1 FIGURE 2 FIGURE 3
FIGURE 4 FIGURE 5 FIGURE 6

Appendix B - Tables

TABLE B-1 TABLE B-2
TABLE B-3 TABLE B-4

Appendix C - Baseline Soil Gas & Groundwater Data

TABLE C-1 TABLE C-2

APPENDIX D - MANIFESTS DISPOSAL DOCUMENTATION

APPENDIX E - BACKFILL DOCUMENTATION

APPENDIX F - CAMP SUMMARY RESULTS

APPENDIX G - WELL ABANDONMENT DOCUMENTATION

APPENDIX H - PROJECT PHOTOGRAPHS

PROFESSIONAL ENGINEER'S CERTIFICATION

Bay Shore OU1 - Final Remedial Action Plan

Bay Shore OU1 - Final Draft RAP Complete Report

Bay Shore OU1 - Final Draft RAP Complete Report Cover Letter

OU-2

OU-2 IRM Installation Summary Report for Former BayShore/Brightwaters MGP Site

Appendix A Appendix B Appendix C
Appendix D Appendix E  

Decision Document Draft for Former BayShore/Brightwaters MGP Site

BayShoreFinalOU-2RDD

pdf Addendum1PlumeTail Design061209.pdf

pdf AppC_33N_Clinton-Cooper.pdf


Oxygen Injection Systems Locations Map in OU-2 of the Bay Shore/Brightwaters Former MGP site

OU-3

Storm Sewer and Catch Basin Investigation Summary Report

DRAFT Drainage Network Rehabilitation Interim

Brightwater Final Supplemental Invetigation Report

OU-4

Interim Remedial Measure Work Plan for Bay Shore Former MGP Site OU-4

Final Crum's Brook Summary Report-November 2002